Want to grab assignment solutions on the CQS101 Residential Estimation Assignment Task? Visit Assignmenttask.com. We deliver assignment help services online with 100% original content quality. We have well-experienced assignment writers who have knowledge of assignment writing services. You can connect with us at any time worldwide.

 

Order Now

 

Scenario

You are an estimator in a construction company. A client has come to you for advice on tendering for a house for which the design has been completed. They are particularly interested in knowing about the information to be supplied in the tender, as well as different trades that can be involved in residential construction.

 

Task 1: Tendering

Before the client gives you the tender documents you have asked for, they are interested in knowing how you and your company will handle the process.

(a) Compare the two most commonly used methods of tendering and discuss their differences.

(b) Which one would you use for the current project? Explain why; and include your reason for not using the other.

(c) List four criteria for evaluating whether contractors are prequalified for the project.

 

Task 2: Pricing Trades

After a few months the client sends you some documents to complete a tender. This includes a schedule of quantities, tender drawings and specifications.

Project requirements

  • The client wants to start this project in the last quarter of this year.
  • The site is on good ground with no hard rock and soft spot issues. No demolition is required and there is sufficient access for plant/equipment to be used.
  • Whenever there is an item within the SOQ below, for which the price has not been provided within this assignment (either listed or in any of the quotes), then you are required to ascertain these yourselves. Contacting suppliers etc by phone or their websites is a good way of doing this.
  • Your company will perform excavations and your manager asks you to price the groundworks. You are to use the information provided in Appendix A: Excavation, along with the following information.
  • Assume the hourly excavation machinery rate for the groundworks is inclusive of driver, travel to site, fuel costs, and so on.
  • On your company’s database is the following information for pricing the concrete trade. Formwork details are available in Appendix B: Concrete.
  1. Pumping rate 37.75 (m3/hr) inclusive of travel time and site charges.
  2. Waste: 3.50%.
  3. Vibrator hire ($/day): $86.55.
  4. Vibrator delivery ($/day): $3.50.
  5. Tradesperson ($/hour): $56.25.
  • Use labour constants available in QV Cost builder or any reference materials known to you. If you use a resource other than QV Cost builder, give the name of the resource.
  • On your company’s database is the following information for pricing the reinforcement.
  1. Labour: $38.25 per hour.
  2. Tradesperson: $55.25.
  3. Waste: 4.50%.

The following is an excerpt from the Schedule of Quantities.

 

DescriptionUnitQtyRate
Groundworks
Generally
Refer to the Introduction, General Rules and Recommendations of the ANZSMM 2018 (First Edition)
Refer to the relevant Specification sections containing particulars of Groundwork
Refer to Section 4 of the ANZSMM 2018 (First Edition) for details of Measurement and Prices
Work in other trades
The following items have been measured in other trade sections:
Filling to garden beds: Exterior Elements
Planting and associated excavation and filling work:Exterior Elements
Turfing including imported topsoil: Exterior Elements
Excavation and beds for paths/driveways: Exterior Elements
Excavation for electrical and hydraulics/drainage services

and connections have been measured in their relevant trade sections

Site Clearance
Clear site to remove all vegetation, shrubs, debris, rubbish, and the like, including grubbing out stumps and rootsand backfilling and compacting grub holes 

m2

 

115

Excavation
Excavate over area of building and strip topsoil to a depth of 150 mm from existing ground levels and stockpile on

site approximately 10 m away from building

m293
Excavate over area of building to a depth of 250 mm from

stripped ground levels and prepare and compact the excavated surface as specified: 93 m2

 

m3

 

24

Excavate trench for concrete footings up to 1 m deep below reduced levelsm39
Ïilling and Hardcore
100 mm thick compacted approved hardfill under floor slab, well consolidated, and as per specificationsm2115
Concrete
In Situ Concrete
Generally
Refer to the Introduction, General Rules and Recommendations of the ANZSMM 2018 (First Edition)Note
Refer to the relevant Specification sections containing particulars of In Situ ConcreteNote
Refer to Section 6.1 of the ANZSMM 2018 (First Edition) for details of Measurement and PricesNote
Samples
Allow for providing samples of materials or finishesItem
Tests
Allow for testing materials, concrete specimens and similarItem
Protecting and Curing
Allow for protecting and curing concrete, stating total areasof formed surfaces and areas of slabs on groundItem
Ïootings
10 MPa plain concrete in:
50 mm blinding, spread and levelled under pile pads and footingsm32
25 MPa plain concrete in:
Pads to timber piles 600 x 600 x 400 mmNo4
Pads to timber piles 400 x 400 x 900 mmNo2
20 MPa reinforced concrete in:
Pad footings 450 mm x 450 mm x 250 mmNo5
Pad footings 1900 mm x 400 mm x 250 mmNo12
Slabs
20 MPa reinforced concrete in:
Floor slab laid on sand blinding, 0–100 mm thick: 105 m2m311
Ïormwork
Generally
Refer to the Introduction, General Rules and Recommendations of the ANZSMM 2018 (First Edition)Note
Refer to the relevant Specification sections containing particulars of FormworkNote
Refer to Section 7.1 of the ANZSMM 2018 (First Edition) for details of Measurement and PricesNote
Certification
Allow for providing engineer certification of formal designItem
Shop Drawings
Allow for preparation of shop drawingsItem
Protecting and Curing
Allow for protecting and curing concrete stating total areasof formed surfaces and areas of slabs on groundItem
Ïootings
Class F1 finish formwork to:
Vertical faces of blinding, 0–250 mm highm47
Vertical faces of footings, 0–250 mm highm19
Ditto, 400 mm highm24
Ditto, 900 mm highm23
Slabs
Class F4 finish formwork to:
Free edges of floor slabs laid on blinding, 0–250 mm highm42
Reinforcement
Generally
Refer to the Introduction, General Rules and Recommendations of the ANZSMM 2018 (First Edition)Note
Refer to the relevant Specification sections containing particulars of ReinforcementNote
Refer to Section 8 of the ANZSMM 2018 (First Edition) for details of Measurement and PricesNote
Bending Schedule
Allow for preparation of bending schedules forbar reinforcement and fabric reinforcementItem
Ïootings
D16 rod reinforcementkg87
D12 rod reinforcementkg96
D10 rod reinforcementkg17
Slabs
D12 rod reinforcementkg78
D10 rod reinforcementkg9
R6 stirrup reinforcementkg3
668 Mesh reinforcement lapped 150 at jointsm229
SE62 Mesh reinforcement lapped 200 at jointsm229
Masonry
Generally
Refer to the Introduction, General Rules and Recommendations of the ANZSMM 2018 (First Edition)Note
Refer to the relevant Specification sections containing particulars of MasonryNote
Refer to Section 12 of the ANZSMM 2018 (First Edition) for details of Measurement and PricesNote
Samples
Allow for providing samples of materialsItem
Sample Panels
Allow for constructing a sample panel of face of brickworkor blockworkItem
Tests
Allow for testing materials, concrete specimens and similarItem
Exterior Work
Ïootings
200 mm concrete blockwork in stretcher bond bedded inmortar as described, solid filled (rising to 600 mm

high max)

m225
Corner blocksm2
Concrete grout filling as described to 200 mm thick wallm225
External Wall
200 mm concrete blockwork in stretcher bond bedded

inmortar as described, solid filled (rising to 800 mm high max)

m234
Corner blocksm2
Bond beamm75
Concrete grout filling as described to 200 mm thick wallm263
Ditto, to bond beamsm75

 

(a) Use information provided in Appendix A to price excavation/groundworks.

  • Enter SoQ rates into the SoQ.

You determine which trades are to be priced in-house and which will be sent out to subcontractors and suppliers for pricing. After compiling all information required for subcontractors and suppliers, you received quotations for:

  • concrete
  • reinforcement
  • blockwork.

(b) Use information provided by your chosen subcontractor or supplier in Appendix B to price concrete and formwork.

  • Compare the quotes using suitable tables.
  • Explain your reason for choosing your preferred subcontractor or supplier.
  • Calculate the SoQ rates and enter the rates into the SoQ.

(c) Use information provided by your chosen subcontractor or supplier in Appendix C to price Note each stirrup is 830mm long.

  • Compare the quotes using suitable tables.
  • Explain your reason for choosing your preferred subcontractor or supplier.
  • Calculate the SoQ rates and enter the rates into the SoQ.

(d) Use information provided by your chosen subcontractor in Appendix D to price masonry.

  • Compare the quotes using suitable tables.
  • Explain your reason for choosing your preferred subcontractor.
  • Calculate the SoQ rates and enter the rate into the SoQ.

Provide your calculations for all rates.

 

Task 3: On costs – overheads and profit

Several weeks have passed and your client is expecting your pricing. You have completed compiling and entering all of your subcontractors’ and suppliers’ rates in the SoQ and are now ready to finalise your cost estimate by applying on-costs for overheads and profit. Create a Tender Summary calculate the following:

(a) Prepare a completed SOQ. This will only consist of the trades noted in Task 2 along with an ‘all in’ cost of $5,237.26 for direct P&G Calculate your company’s indirect overheads as a percentage (to two decimal places). Determine the value of the indirect P&G cost and add this (as a single line item) to the total of your SOQ: Once this is completed, determine the project subtotal to date.

  • Turnover of business: $4,300,00
  • Total cost of overheads: $295,00

(b) On completion of Task 3a, add the following items to your SOQ to determine the final value of your tender:

  • Profit: 7.50%.
  • Provisional sum: $7,500.
  • Contingency sum: $25,000.
  • GST: 15%. 

Provide your calculations for all rates.